|
Incoming Trailer Inspection
The Shipping & Receiving Department conducts a documented
inspection of all incoming trailers and their contents
for security. A comprehensive checklist is used
to maintain thorough and consistent inspections. Any
physical, chemical or biological conditions which may
render the shipment unfit for food use is held for QA
(Quality Assurance) disposition. QA will contact
the supplier, the customer or both to discuss and determine
the best course of action to be taken.
Incoming Ingredient Inspection
The QA Raw Material Technician approves and documents
ingredients and packaging received from customer approved
suppliers. This process includes raw material sampling/testing,
verification of COA (Certificate Of Analysis) with the
approved customer requirements and verifies the materials/ingredients
are stored in specified conditions. Any issues
discovered by the QA Tech will be held until QA contacts
the customer to discuss proper course of action to be
taken.
Ingredient Storage
Ingredients are stored as delineated by customer specifications
or in accordance with GMPs and Allergen Control Protocol. Grain-based
materials are restacked every month. Other ingredients
are inspected and restacked every three (3) months. If
any nonconformity is found, those materials are segregated
and held for QA disposition.
Call us at (815) 853.4348
|